99久久久精品免费观看国产-99久久久久国产精品免费-99久久久久久久-99久久免费观看-国产精品剧情原创麻豆国产-国产精品久热

Ten key points of energy saving and emission reduction in Jiangsu in 13th Five-Year

2018-1-16 17:31:35 0

Ten key points of energy saving and emission reduction in Jiangsu in 13th Five-Year

    Recently, the Jiangsu provincial government issued the "Jiangsu 13th Five-Year" energy saving and emission reduction comprehensive implementation plan (hereinafter referred to as the "plan"). The plan defines the specific road map and construction schedule for Jiangsu's "13th Five-Year" continuous deepening of energy conservation and emission reduction. Xiaobian summed up the ten major points of "energy saving and emission reduction" in 13th Five-Year.

First, nitrogen and phosphorus first emission reduction index VOCS continue to pressurize

he total amount of chemical oxygen demand, ammonia nitrogen, total nitrogen, total phosphorus, sulfur dioxide, nitrogen oxides and volatile organic compounds were controlled within 912 thousand tons, 119 thousand tons, 292 thousand tons, 27 thousand tons, 668 thousand tons, 854 thousand tons and 1 million 496 thousand tons, respectively, and dropped 13.5%, 13.4%, 11.21%, 11.33%, 20%, 20% and 20% respectively in 2015.

Compared to the national "13th Five-Year" energy conservation and emission reduction comprehensive plan, the small editor found that total nitrogen and total phosphorus are Jiangsu "characteristic" emission reduction targets, and VOCS also increased from 10% to 20%.

Two, energy structure adjustment into the fast lane

1 gradually expand the no burning zone and no more coal-fired power generation and cogeneration units. We should promote natural gas and electric energy substitution and reduce the consumption of loose coal and oil products.

From 2 to 2020, the total consumption of coal in the province decreased by 32 million tons compared with that in 2016, and the proportion of coal consumption to total coal consumption increased to more than 65%.

3 non fossil energy accounts for 11% of total energy consumption and the proportion of natural gas consumption to 12%.

Contrasting the national "13th Five-Year" comprehensive plan of energy conservation and emission reduction, the energy optimization target formulated by Jiangsu is stricter than the national goal.

Look at three, the net building is greener

From 1 to 2020, the level of industrial energy efficiency and cleanliness increased significantly. The energy consumption of added value of Industrial Enterprises above designated size decreased by more than 18% compared with 2015.。

2 Jiangsu will add 500 million square meters of green building to carry out the pilot demonstration of energy saving 75% and ultra-low energy consumption passive green building.

3 By the end of 2020, the energy efficiency level of new buildings in cities and towns increased by 20% compared with that in 2015, and accumulated 14 million 500 thousand tons of standard coal in 13th Five-Year.

Look at four, public institutions run energy saving

From 1 to 2020, energy consumption per unit area, energy consumption per capita and water consumption per capita were reduced by 10%, 11% and 16% respectively compared with 2015.

2 the establishment of 500 provincial public institutions energy saving demonstration units, selection and release of 100 government organs, schools, hospitals and other types of provincial public institutions energy efficiency leaders

3 the public institutions take the lead in eliminating old and old vehicles, taking the lead in purchasing energy saving and new energy vehicles, and the proportion of public institutions buying new energy vehicles has increased to more than 50% of the total number of updated vehicles in the year.

Look at five and treasure Taihu baby

By the end of 12018, Jiangsu will complete the shutdown and transfer of chemical enterprises in the Taihu first level protection zone, and prohibit the restriction of the capacity of the project (except for the relocation and upgrading projects) into the park.

From 2 to 2020, the total amount of chemical pesticides and fertilizers decreased by more than 20% compared to 2015.

3 the net farming area in Taihu is less than 45 thousand mu.。

Look at six and make the door more ecologically happy

From 1 to 2020, the new sewage pipe network in the province was more than 7000 kilometers long. Municipal sewage treatment plants above the county level will fully implement the first class A emission standards by the end of 2017.

From 2 to 2019, the sewage treatment rates in cities and counties reached 95% and 85% respectively. By 2020, the sewage treatment facilities will be covered.

From 3 to 2020, the urban planning and development villages in South of Jiangsu, the village of the administrative village of the Central Soviet Union and the village of the larger planning and development villages in the north of Jiangsu Province were covered by more than 90% of the sewage treatment.

y the end of 42020, the comprehensive utilization of sewage sludge or permanent treatment and disposal facilities had been fully covered by the county (city), and the harmless disposal rate reached 100%.

Black odor water was basically eliminated 52020 years ago.

Look at seven, make the agricultural products healthier

From 1 to 2020, the amount of chemical fertilizer was reduced by 5% compared with 2015, and the amount of pesticide application was ensured to achieve zero growth.

In the past 22020 years, the net area of the main lakes in the province has been controlled within 750 thousand mu, and the fishing vessels have been reduced by 845 or 73846 kilowatts.

Look at eight, recycle the resources

From 1 to 2020, all provinces above the provincial level and the 8 chemical industrial parks along the Yangtze River (concentrated areas) will be recycled and strive to create 10 green industrial parks.

2 in accordance with the ideas of waste collection and classification, integration of recycling networks, integrated terminal facilities, sharing of infrastructure, coordination of environmental disposal, diversification of operating modes and information management of management services, the construction of urban vein industrial parks is carried out.

Nine, focus on giving full play to policy incentives and constraints.

1, in line with the industrial credit rating and elimination of backward production capacity and other industrial policies, we should strictly implement the differentiated pollution charging policy.

2 actively promote the reform of environmental tax and fee. We should implement the sewage treatment fee policy and improve the paid use and trading price system of emission permits.

3, strict implementation of desulfurization, denitration, dust removal and ultra low emission environmental price policy. Establish a fiscal policy linked to the total amount of pollutants.

4 innovate financial funds to support the key projects and projects of energy conservation and emission reduction, and give full play to the leverage of financial funds.

5 to improve the ecological compensation system of regional compensation for environmental resources, ecological red line compensation, basic farmland compensation, cross regional waste disposal compensation and other ecological compensation systems, increase the financial transfer payment, and focus on the ecological protection special zones and the ecological protection leading areas.


Ten, the responsibility for compacting the target

1 the local government, which has not completed the target of reducing the energy intensity, carries out the accountability, and notified and criticized the task of the unfinished energy consumption and the total amount control of coal consumption, and carried out the limited batch of high energy consumption projects.

2 for the areas where the environmental quality is improved and the targets for the total emission reduction are not completed, the environmental assessment examination and approval for the construction projects of the newly added emission key pollutants are suspended, the financial support is suspended or reduced, and the scope of environmental protection inspection should be included when necessary.

3 the results of energy saving and emission reduction of key units were announced and included in the social credit record system, and the new and high energy consumption projects were approved or approved for the unfinished target tasks.

主站蜘蛛池模板: www.国产视频| 狠狠色狠狠色综合网| 91视频网页版| 欧美人体xxxx| 国产91在线播放| 久久久最新精品| 成人91视频| 激情婷婷六月天| 亚洲国产精品成人午夜在线观看| 黄色片在线观看网站| 亚洲欧美自拍视频| 国产免费麻豆| 日韩视频在线一区| 91精品国产乱码久久久久久| 九一福利视频| 亚洲狠狠狠一区二区三区| 国产精品久久久99| 欧美com| 网色视频| 国产免费一区二区三区最新| 色视频在线观看网站| 91精品国产综合久久精品| 精品国产成人a区在线观看| 午夜久久久精品| 99爱在线精品视频网站| 久久黄色大片| 视频黄色在线| 探花在线播放| 国产高清福利91成人| 欧美123| 一区二区三区免费视频网站| 国产精品3| 久久精品精品| 色婷婷综合和线在线| 网站色哟哟| 9久9久女女热精品视频免费观看| 开心激情五月婷婷| 思99re久久这里只有精品首页| 一本色道久久综合亚洲精品高清| 国产亚洲欧洲精品| 免费成人在线观看视频|